又粗又爽高潮午夜免费视频,宿主每日被guan满的日常,少洁白妇无删减全文阅读,浪小辉巨大粗爽gvvideos

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.sihainj.com/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

鋼筋加工棚的8點安裝事項

來源:http://www.sihainj.com/   發(fā)布時間:2023-02-17

鋼筋加工棚是施工現(xiàn)場鋼筋調(diào)直、彎曲和焊接的場所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對接,(不要擰14個螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個螺絲)。否則,支架的孔沒有對齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時,確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個2.99米鉆尾,鋼筋加工棚4個2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.sihainj.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://www.sihainj.com consulting service

欧美猛男军人gay巨大| 久久国产精品99久久久久久| av无码精品久久久久精品免费| 当着全班面被c到高潮哭视频| 18禁高潮出水呻吟娇喘蜜芽| 玩弄japan白嫩少妇hd小说| 欧美精产国品一二三产品区别在哪 | 先の欲求不満な人妻在线| 男女交性视频无遮挡全过程| 丰满人妻中伦妇伦精品app| 永久免费观看不收费的软件app| 拍裸戏时被c了h| 性久久久久久| 国产老色鬼无码免费视频| 无码办公室丝袜ol中文字幕| 好男人好资源影视在线| 亚洲第一综合天堂另类专| 国产精品一亚洲av日韩av欧| 西西人体艺术| 两个人做人爱视频免费| 欧美视频| 国产精品久久久久久吹潮| 少妇性按摩无码中文a片| 寡妇大j8又粗又大| 中国熟妇色xxxxx中国学生| 无码一区二区三区av免费蜜桃视| 娇妻玩4p被三个男人伺候电影| 婷婷五月综合缴情在线视频| gogogo日本免费观看电视| 少妇被歹徒蹂躏惨叫小说| 大香煮伊区一二三四区2021 | 欧美男男猛男gayxxx| 和朋友换娶妻a2020| 肥老熟妇伦子伦456视频| 被窝里的翁憩二十六| 老太bbwwbbww高潮| 受被攻c哭高h视频网站| 哦┅┅快┅┅用力啊┅┅小说| 五十六十丰满老熟妇hd| 日韩av无码一区二区三区不卡| 久久97久久97精品免视看秋霞|